![ON AND ON. Students are stuck in the parking lot lines as 8 a.m. approaches fast. Construction on Randolph avenue has led to more congestion in this entrance. “The problem is definitely the construction, Sophomore Nellie Larson said.](https://www.rubiconline.com/wp-content/uploads/2023/10/IMG-4372-1200x900.jpg)
Parking lot lines lead to increase in tardies
Nora Grande, Staff Writer
• October 27, 2023
![Sophomore Clara Garner and junior Isabelle Wolpert talk at the Grand Opening.](https://www.rubiconline.com/wp-content/uploads/2019/10/20191012_spa_319-900x599.jpg)
Grand Opening showcases grand achievements
Melissa Nie, Director of RubicOnline
• October 14, 2019
![Construction on the Randolph campus wont stop with the Schilling Center.](https://www.rubiconline.com/wp-content/uploads/2019/02/Untitled-1-900x612.jpg)
[Q&A] Roberts addresses future construction goals
Mimi Geller, Director of RubicOnline
• February 7, 2019
![With renovations shifting to Thompson, lockers must be emptied](https://www.rubiconline.com/wp-content/uploads/2018/01/NIB.jpg)
With renovations shifting to Thompson, lockers must be emptied
News in Brief
• November 14, 2018
![Renovation at SPA has been going continually since last year, but some things stay the same. This fireplace from the original building back in 1900 is preserved in the Old Main classroom.](https://www.rubiconline.com/wp-content/uploads/2018/11/Copy-of-DSC_8191-900x600.jpg)
Aggressive construction schedule meets delays with Old Main
Joshua Harrison, Staff Writer
• October 12, 2018
![A rendering of the new English Commons to be built in Old Main.](https://www.rubiconline.com/wp-content/uploads/2018/09/English-Commons-Old-Main-Rendering-900x506.jpg)
Upper School renovations lead to detours and closed spaces
Lucy Benson and Will Rinkoff
• September 9, 2018
![As the construction on the Schilling Center wraps up, the next phase -- the Upper School renovation -- begins. Ninth grader Eli Conrad-Wovcha said, “I’m excited and all, but I don’t know how I’ll ever find where all my classes are next year.”](https://www.rubiconline.com/wp-content/uploads/2018/05/IMG_0238-900x675.jpg)
Upper School campus prepares for new round of renovations
Bobby Verhey, RubicOnline Editor
• June 9, 2018
The Portables (Ep. 2): Ben Danielson
Isabel Gisser, RubicOnline Editor
• February 14, 2018
![Answers to your Schilling Center and renovation questions](https://www.rubiconline.com/wp-content/uploads/2017/11/IMG_4647-1-1333x1000.jpg)
Answers to your Schilling Center and renovation questions
Ellie Nowakowski, Illustrations/Infographics
• November 15, 2017
![US math teacher Jim McVeety has been teaching at SPA for 36 years, so he has witnessed how the numerous construction projects have impacted the building demographic over time. “The most notable change since I started teaching was that the Shepard Center changed from a place for kids to hang out and eat lunch into what it is now [the current arts and music wing],” McVeety said.](https://www.rubiconline.com/wp-content/uploads/2017/11/image1.png)
McVeety reflects on SPA’s construction history, impacts
Bobby Verhey, Staff Writer
• November 15, 2017
![Minneapolis will host Super Bowl LII in 2019 in U.S. Bank Stadium.](https://www.rubiconline.com/wp-content/uploads/2017/10/US-BANK-1500x591.png)
Super Bowl construction creates conflict for commutes
Andrew Johnson, The Rubicon Editor
• October 22, 2017
![The gym foyer is covered by plastic sheets, blocking from the construction. “It smells like wood and it is kinda noisy, but as long as we keep the doors closed by the sophomore benches, I don’t think anyone notices it too much,” sophomore Lauren Hansen said.](https://www.rubiconline.com/wp-content/uploads/2015/05/construction-lawl.jpg)
Huss Center construction closes Gym Foyer
Emily Thissen, News Editor
• May 22, 2015
Load More Stories